Getting Started - VXI VT1422A User Manual

Remote channel multi-function dac module user’s and scpi programming manual
Table of Contents

Advertisement

Installing Signal
The following illustrations show the steps used to install Signal
Conditioning
Conditioning Plug-ons (SCPs). Before installing an SCPs, reading the
"Separating Digital and Analog SCP Signals" in Appendix E page 483 is
Plug-Ons
recommended.
Caution
Use approved Static Discharge Safe handling procedures
anytime the covers are removed from the VT1422A or when
handling the SCPs.
Installing SCPs: Step 1, Removing the Cover VT1422A
2
Remove the SCP
1
Retaining Screws
Remove 2 screws (#10 Torx);
lift front and slide out tabs
Chapter 1

Getting Started

25

Advertisement

Table of Contents
loading

Table of Contents