Installing A Hot-Swap Drive Bay; Hot-Plug Indicator Board; Figure 43. Removing A Hot-Plug Indicator Board - Intel SRSH4 - Server Platform - 0 MB RAM Service Manual

Service guide
Table of Contents

Advertisement

Installing a Hot-Swap Drive Bay

To install a hot-swap drive bay:
1. Slide the drive bay into the chassis, pushing it firmly to the rear to fully engage the locking tabs
in the chassis slots.
2. Connect the cables to the back of the drive bay.
3. Install any devices in the media bay.
4. Install the hot-swap drives.
5. Install the front access cover, the rear access cover, and the bezel.
6. Plug the AC power cords into the power source and turn on power to the server.

Hot-Plug Indicator Board

To replace the hot-plug indicator board:
1. Remove the rear access cover.
2. Disconnect the ribbon cable from the end of the hot-plug indicator board.
3. Remove the two plastic rivets that secure the board to the electronics bay (Figure 43, C).
4. The end of the board where the cable attaches is inserted into a notch in the chassis. Tilt out the
free end of the board and lift the board out of the notched bracket in the back of the electronics
bay. Two plastic rivet inserts remain in the mounting holes in the chassis.
Installing and Removing Components
A
Ribbon cable
B
Rivet sleeve

Figure 43. Removing a Hot-plug Indicator Board

C
Rivet
77

Advertisement

Table of Contents
loading

Table of Contents