IBM Flex System p24L Installation And Service Manual page 233

Compute node
Hide thumbs Also See for Flex System p24L:

Advertisement

C2006040 • C20062FF
C2006040
Explanation: Preparing to initiate LID load from load source
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006050
Explanation: LP configuration LID primed successfully
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006060
Explanation: Waiting for LID load to complete
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006100
Explanation: LID load completed successfully
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006200
Explanation: Loading raw kernel memory image
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C20062FF
Explanation: Loading raw kernel memory image completed successfully
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
221
Chapter 8. Troubleshooting