C20043FF • C2006030
C20043FF
Explanation: Load source device is connected
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006000
Explanation: Locating first LID information on the load source
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006005
Explanation: Clearing all partition main store
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006010
Explanation: Locating next LID information on the load source
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006020
Explanation: Verifying LID information
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2006030
Explanation: Priming LP configuration LID
Response:
1. Go to Recovering the system firmware.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
220
Power Systems: IBM Flex System p24L Compute Node Installation and Service Guide

Advertisement

loading
Need help?

Need help?

Do you have a question about the Flex System p24L and is the answer not in the manual?

Subscribe to Our Youtube Channel