Connecting The Power Supply - Omron ZG User Manual

2d profile measuring sensors
Hide thumbs Also See for ZG:
Table of Contents

Advertisement

< Removing the cable >
Loosen the fastening screws (two locations) to unlock the cable, and then draw out the
connector straight from the Sensor side.
Note
To extend the connection between the Sensor and the Controller
The cable connection between the Sensor and the Controller can be extended by using the
extension cable (sold separately), Digital equalizer and Digital equalizer connection cable.
Attach the ferrite cores (supplied) to both ends of the extension cable and Digital equalizer
connection cable.
Digital equalizer
ZG-XEQ
Cable for Sensor:
0.5 m (2 m)
(flexible cable)
(*1)
When attaching the ferrite core to both ends of the extension cable, pass the cable once through the ferrite
core.

Connecting the Power Supply

Important
After turning the power supply ON, allow the product to stand for at least 30 minutes before
use. The circuits are still unstable just after the power supply is turned ON, so measurement
values may fluctuate gradually.
ZG User's Manual
Digital equalizer
(*1)
Extension cable
ZG-XC3CR: 3 m
ZG-XC8CR: 8 m
ZG-XC15CR: 15 m
ZG-XC25CR: 25 m
(flexible cable)
1
Note
The
recommended:
• S8VS-03024 (DC 24 V, 1.3 A)
Be sure to connect the Controller to the
power supply in a 1:1 connection.
ZG-XEQ
Digital equalizer
connection cable
ZG-XC02D: 0.2 m
(flexible cable)
Connect the power wire (brown)
and GND wire (blue) of the
Controller's I/O cable to the
DC24V (±10%) power supply.
following
power
Mounting and Connecting Devices
supply
is
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zg seriesZg-wds70Zg-wds22Zg-wds8tZg-wds3t

Table of Contents