Connecting The Power Supply - Omron ZG2 Series User Manual

Smart sensor 2d profile measuring sensors
Hide thumbs Also See for ZG2 Series:
Table of Contents

Advertisement

<Removing the cable>
Loosen the fastening screws (two locations) to unlock the cable, and then draw out the
connector straight from the Sensor side.
Note
To extend the connection between the Sensor Head and the Controller
The cable connection between the Sensor Head and the Controller can be extended by using
the extension cable (sold separately). Attach the ferrite cores (supplied) to both ends of the
extension cable.
Cable for Sensor
(flexible cable): 0.5 m, 2 m

Connecting the Power Supply

Important
After turning the power supply ON, allow the product to stand for at least 30 minutes before
use. The circuits are still unstable just after the power supply is turned ON, so measurement
values may fluctuate gradually.
ZG2 User's Manual
Extension cable
(Flexible cable)
ZG2-XC3CR: 3 m
ZG2-XC8CR: 8 m
ZG2-XC15CR: 15 m
ZG2-XC25CR: 25 m
1
Connect the power wire (brown)
and GND wire (blue) of the
Controller's I/O cable to the 24
VDC (
Note
The
following
recommended:
• S8VS-03024 (24V DC, 1.3 A)
Be sure to connect the Controller to the
power supply in a 1:1 connection.
Mounting and Connecting Devices
±
10%) power supply.
power
supply
is
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zg2-wds70Zg2-wds22Zg2-wds8tZg2-wds3vt

Table of Contents