IMPORTANT! The stands are labelled R and L. The side labelled R must be pla-
ced into the right-hand frame tube of the coulter bar and the side la-
belled L must be placed into the left-hand frame tube (8). The long
side (A) of the stand must face forwards.
4
5
6
of the manufacturer (of the tractor or third-party implement).
Using the hydraulic three-point linkage, lower the implement until the stands touch
the floor.
Lower the hydraulic three-point linkage further and carefully move the tractor a
few millimetres forwards or backwards until the catch brackets/hooks of the hy-
draulic three-point linkage are disconnected from the implement.
Once the implement has been disconnected from the soil-working implement, ca-
refully drive the soil-working implement away from the implement.
Please study and follow the general safety information and the
The horizontal bar of each stand (3) is a trip hazard when the
Never step beneath the stand (3) when coupling/uncoupling the
24
'Attached implements' safety information!
implement is parked.
implement.
Coupling and uncoupling the seed drill
You then disconnect the electrical and hy-
draulic lines and place them on the imple-
ment.
Dismantle the linch pin (6) and then the
fastening shackle (5).
In the case of the coupling parts for third-
party implements or solo operation, you
must also observe the operating instruc-
tions
Need help?
Do you have a question about the Saphir 8 AutoLoad and is the answer not in the manual?