3
PREPARATION OF THE TRACTOR
3.1
Tyres
Ensure that all are at the manufacturer's recommended pressures and that left
and right hand side tyre pressures are identical. (See manufacturer's instructions)!
3.2
Lift Rods
Adjust lift rods to equal length by means of the adjuster device. (See tractor manu-
facturer's instructions)
3.3
Check Chains or Sway Blocks of the Three Point Linkage
Check chains or sway blocks MUST be adjusted so that the lower links are always
free to move sideways during working.
3.4
Hydraulic equipment
The following control units are required on the tractor for the hydraulic equipment
of all mounted seed drills:
Hydraulic harrow lift
Hydraulic lift
Hydraulic coulter pressure adjust-
ment (only for Suffolk coulters and
single-disc coulters)
Hydraulic advance marking, single-
acting (for track markers)
Hydraulic advance marking, single-
acting (without track markers)
* With pressure-free return or alternatively on a double-acting control unit
3.5
Control
For operation and transport the tractor hydraulic is to be switched to "position
control". See manufacturer's instructions!
16
Required control units
Single-acting
1
---
1
1
1*
Preparation of the tractor
Double-acting
---
1
---
---
Need help?
Do you have a question about the Saphir 8 AutoLoad and is the answer not in the manual?