HPE ProLiant MicroServer Gen10 Plus v2 User Manual page 61

Hide thumbs Also See for ProLiant MicroServer Gen10 Plus v2:
Table of Contents

Advertisement

11. Install the system board assembly .
12. Install the chassis cover .
13. If removed, install the security padlock and/or the Kensington security lock.
For more information, see the lock documentation.
14. Connect all peripheral cables to the server.
15. Connect the power adapter to the server, and then secure the power adapter cord in the power cord clamp.
16. Connect the power cord to the AC source.
17. Power up the server .
Results
Results
The installation is complete.
The iLO dedicated network port is now the default port for iLO connection. To configure the iLO dedicated network port settings, see the
iLO user guide:
https://www.hpe.com/support/ilo-docs
https://www.hpe.com/support/ilo-docs
Cabling
Cabling
This chapter includes cabling guidelines and diagrams for internal component cabling.
Subtopics
Subtopics
Cabling guidelines
Cabling guidelines
Storage cabling
Storage cabling
Fan cabling
Fan cabling
HPE ProLiant MicroServer Gen10 Plus v2 User Guide
61

Advertisement

Table of Contents
loading

Table of Contents