Towing

f
Heed all regulations and apply all safety
measures applicable for towing heavy
construction machines.
m
The towing vehicle must be capable of
securing
the
on slopes.
Use only approved tow bars!
If necessary, remove any attachments
and accessories from the paver finisher
and the screed until the basic width has
been attained.
A hand pump (1) is located in the engine
A
compartment (left side); it must be actu-
ated to be able to tow the machine.
Pressure for releasing the traction sys-
tem brakes is built up with the
hand pump.
- Release lock nut (2), screw threaded
dowel (3) into pump as far as possible
and secure with lock nut.
From serial number 2281 et seq.:
A
- Push knob (3a) into the valve body.
While pumping (next step), check
that the knob remains in the pressed
position.
- Actuate lever (4) of hand pump until
sufficient pressure has been built up
and traction system brakes have been
released.
m
On completion of the towing process, re-
store the initial status.
m
Only release the traction system brakes
when the machine is sufficiently secured
against accidental rolling or is already properly connected to the towing vehicle.