Mitsubishi Electric GT11 User Manual page 321

Graphic operation terminal
Hide thumbs Also See for GT11:
Table of Contents

Advertisement

16.3 BootOS and Standard Monitor OS Installation Using CF Card
16.3.2 Installation method using the program/data control function (Utility)
The CF card access LED is lit during install
4
execution.
Do not pull out the CF card, power OFF, or
5
reset the GOT while the CF card access
card is lit.
After the installation is finished, the dialog
6
box shown on the left is displayed.
Touch the
OK
button to reboot the GOT.
7
After confirming that GOT restarted
8
normally, switch OFF the CF card access
switch of GOT.
Confirm the CF card access LED is
9
extinguished, remove the CF card from the
CF card interface of GOT.
9
10
11
12
13
14
15
16
16 - 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got1000

Table of Contents