Hyundai 35DS-7 Operation Manual page 242

Table of Contents

Advertisement

6)
CHAIN
Chain sheave(V, VF mast)
(1)
Place a sling around carriage and attach
to an overhead hoist. Lift carriage high
enough so that the tension on the chain
over sheaves is relieved after the carriage
is blocked. Position wooden blocks under
the carriage and lower it.
Remove the split pin securing the chain
anchor pins and discard.
supporting the chains, remove the chain
anchor pins and drape the chains over the
carriage.
Remove retaining ring securing sheaves
to sheave support. Remove sheaves
with bearings.
Remove bearining retaining ring from
sheave and press bearings from sheaves.
Thoroughly clean, inspect and replace all
worn or damaged parts.
Reverse the above to assemble and install.
Use new split pins in chain anchor pins.
(2)
Rear chain sheave(TF mast)
Raise and securely block carriage and
inner mast section.
Remove the split pin securing the chain
anchor pins and discard.
supporting the chains, remove the chain
anchor pins from outer mast section.
Remove chains.
Remove retaining ring securing chain
sheaves to sheave support. Pry off
sheaves with bearings.
Remove bearing retaining ring from
sheave and press bearings from
sheaves.
Thoroughly clean, inspect and replace all
worn or damaged parts.
Reverse the above procedure to
assemble and install. Use new split pins
in chain anchor pins.
While
While
8-17
D357MS19
D225MS14

Advertisement

Table of Contents
loading

This manual is also suitable for:

40ds-745ds-735d-740d-745d-7

Table of Contents