Kubota BX24 Workshop Manual page 355

Tractor, front loader, backhoe, rotary mower
Hide thumbs Also See for BX24:
Table of Contents

Advertisement

BX24, RCK54(P)-23BX, RCK60B-23BX, LA240, BT601, WSM
 Roll-back
(1) Boom Control Section
(2) Bucket Control Section
(3) P.B. Passage 1
(4) Spool
(5) Neutral Passage 2
1. When the hydraulic control lever is set to the "ROLL-BACK" position, the spool (4) of the bucket control section
(2) moves to the left, which forms oil passages between passage 2 (8) and B2 port, and between A2 port and T
port.
2. The pressure-fed oil from the P port flows to the neutral passage 2 (5) through the boom control section (1) and
P.B. passage 1 (3). As the oil passage from the neutral passage 2 (5) to the P.B. passage 2 (6) is closed by the
spool (4), this oil opens the load check valve (7), and flows through the notched section of the spool (4) and B2
port to retract the bucket cylinder (9).
3. Return oil from the bucket cylinder (9) flows to the transmission case through the A2 port and T port.
(6) P.B. Passage 2
(7) Load Check Valve
(8) Passage 2
(9) Bucket Cylinder
P : P Port (From Pump)
T : T Port (To Tank)
P.B. :P.B. Port (To 3 Hitch)
A2 : A2 Port
(From Bucket Cylinder)
8-M7
FRONT LOADER
B2 : B2 Port
(To Bucket Cylinder)
a : Low Pressure
b : High Pressure
KiSC issued 08, 2019 A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

La240Bt601Rck54Rck54pRck60b

Table of Contents