Beckhoff EPP3504-0023 Short Manual page 138

4-channel measuring bridge,(sg) full/half/quarter bridge, 24 bit, 10 ksps
Hide thumbs Also See for EPP3504-0023:
Table of Contents

Advertisement

Commissioning on EtherCAT Master
Fig. 68: Choose target system (remote)
In this example, "Runtime system 1 (port 801)" is selected and confirmed. Link the PLC with the real-time
system via the menu option "Online" → "Login", the F11 key or by clicking on the symbol
. The control
program can then be loaded for execution. This results in the message "No program on the controller!
Should the new program be loaded?", which should be confirmed with "Yes". The runtime environment is
ready for the program start:
138
Version: 1.2
EPP3504-0023

Advertisement

Table of Contents
loading

Table of Contents