Installing A Floor-Mounted Multiservice Switch 7440 - Nortel 7400 Hardware Installation

Multiservice switch
Table of Contents

Advertisement

Installing a floor-mounted Multiservice Switch 7440

Prerequisites
Procedure steps
Figure 88
Securing the feet to the bottom of a floor-mounted device
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Install a floor-mounted Multiservice Switch 7440 using four feet to allow for
adequate ventilation.
You need a vertical mount kit with PEC NTHQ08.
Ground yourself to an appropriate anti-static discharge apparatus while
handling the shelf assembly (device).
1
Tip the cabinet on its side.
2
Secure the feet with the 4 screws provided as shown in the figure
"Securing the feet to the bottom of a floor-mounted device" (page 267).
3
Move the device to the appropriate place and set it on its feet. You need 2
people to lift the device.
Chapter 39 Hardware procedures 267
PPT 0910 001 AA