76 Chapter 7 Multiservice Switch 7480 installation
Figure 17
Multiservice Switch 7480 installation task flow: part 2
A
PP_TASK_1012
Task flow navigation
NN10600-175 6.1S2
FP
addition
Yes
Add another
FP?
The following references are listed alphabetically:
"FP addition" (page 151)
"Grounding a Multiservice Switch 7480" (page 231)
"Installing a cooling unit into a Multiservice Switch 7480" (page 260)
"Installing a power supply into a Multiservice Switch 7480" (page 301)
"Installing a Multiservice Switch 7480" (page 286)
"Installing a control processor" (page 254)
"Installing a shelf interconnect cable" (page 307)
"Installing an ac power cable" (page 311)
"Installing dc power cables onto a Multiservice Switch 7480" (page 343)
"Installing ferrite beads onto dc power cables" (page 346)
"Installing FP cables" (page 349)
"Powering up a Multiservice Switch 7480" (page 399)
"Unpacking a Multiservice Switch 7480" (page 536)
Powering up a
Multiservice
No
Switch 7480
End