Nortel 7400 Hardware Installation page 537

Multiservice switch
Table of Contents

Advertisement

Procedure job aid
Table 19
Equipment checklist for unpacking a Multiservice Switch 7480
÷
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Equipment
Device shelving (for 1 or 2 devices, depending on your installation)
Cooling unit chassis
Cooling unit and air filter
Cooling unit cables
Shelf assembly ground cables
Cable management assembly
Power supplies (up to 3)
Power supply filler (3 less the number of power supplies)
CPs (1 or 2)
FPs (up to 15)
FP cables (as required)
Blank processor cards (NTBP23), 14 for each device less the
number of processor cards
Termination panels (as required)
Grounding cable for termination panels
Grounding strips for termination panels (1 for each panel)
Power cords (1 for each power supply)
Power cord selector guide
Antistatic wrist strap
Chapter 39 Hardware procedures 537

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7420744074607480

Table of Contents