264 Chapter 39 Hardware procedures
Installing a desk-top mounted Multiservice Switch 7420
Prerequisites
Procedure steps
NN10600-175 6.1S2
Install a desk-top mount Nortel Networks Multiservice Switch 7420 on any
flat surface, preferably a sturdy desk or table.
•
You need a desk mount kit with PEC NTHQ05.
•
Ensure that your floor plan takes into consideration all of the information
in "Site preparation for free-standing Multiservice Switch equipment"
(page 49).
•
Ground yourself to an appropriate anti-static discharge apparatus while
handling the shelf assembly (device).
1
Secure the feet using the screws provided as shown in "Securing the feet
to a desk-top mounted Multiservice Switch 7420" (page 265).