Task flow navigation
The following references are listed alphabetically:
•
"Clearing a switch request on Multiservice Switch 7400". See
NN10600-550 Nortel Networks Multiservice Switch 7400/15000/20000
Common Configuration Procedures.
•
"Installing FP cables" (page 349)
•
"Locking a function processor". See NN10600-550 Nortel Networks
Multiservice Switch 7400/15000/20000 Common Configuration
Procedures.
•
"Locking a port". See NN10600-550 Nortel Networks Multiservice
Switch 7400/15000/20000 Common Configuration Procedures.
•
"Removing FP cables" (page 445)
•
"Switching between active and standby processor cards". See
NN10600-550 Nortel Networks Multiservice Switch 7400/15000/20000
Common Configuration Procedures.
•
"Unlocking a function processor" See NN10600-550 Nortel Networks
Multiservice Switch 7400/15000/20000 Common Configuration
Procedures.
•
"Unlocking a port". See NN10600-550 Nortel Networks Multiservice
Switch 7400/15000/20000 Common Configuration Procedures.
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Chapter 22 Failed FP cable replacement 137