Nortel 7400 Hardware Installation page 119

Multiservice switch
Table of Contents

Advertisement

Chapter 18
Control processor upgrade
Prerequisites to control processor upgrade
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Upgrade a control processor (CP) by replacing an existing CP with a different
version, or upgrade a pair of matched CPs with a later version than the
existing CPs.
"Prerequisites to control processor upgrade" (page 119)
"Control processor upgrade task flow" (page 120)
CAUTION
Traffic loss due to an outage
Upgrading a CP in a device that does not have redundant
CPs results in traffic loss. The device will be out of service
for the time it takes to perform the upgrade.
CAUTION
Risk of electrostatic damage
When handling processor cards, wear a grounded
antistatic wrist strap so that you do not damage electronic
parts. For more information, see "Avoiding damage from
static electricity" (page 208).
See "Unpacking a processor card" (page 539) for FP and CP handling
instructions.
Some of the procedures in this task are not located in this document.
Ensure that you have access to the required documents.
119

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7420744074607480

Table of Contents