196 Chapter 37 Sparing addition
Sparing addition task flow
NN10600-175 6.1S2
•
If you install termination panels in the back of a seismic cabinet
containing Nortel Networks Multiservice Switch 7480s, leave some rack
space between the termination panels for each device This space aids
airflow through the cabinet and provides space for cables.
•
Route and label appropriate cables before installing sparing panels.
This task flow shows you the sequence of procedures you do to add sparing
capability. To link to any procedure, go to "Task flow navigation" (page 198)