Chapter 3
Multiservice Switch 7440 installation
Prerequisites to Multiservice Switch 7440 installation
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Install a Nortel Networks Multiservice Switch 7440 on the floor or in a rack
or cabinet.
•
"Prerequisites to Multiservice Switch 7440 installation" (page 45)
•
"Multiservice Switch 7440 installation task flow" (page 46)
•
"Multiservice Switch 7440 installation supporting information"
(page 49)
CAUTION
Risk of electrostatic damage
When handling processor cards, wear a grounded
antistatic wrist strap so that you do not damage electronic
parts. For more information, see "Avoiding damage from
static electricity" (page 208).
•
See "Unpacking a processor card" (page 539) for FP and CP handling
instructions.
•
Ensure that you have completed all site preparations. For more
information, see "Multiservice Switch 7440 installation supporting
information" (page 49).
•
If you are installing the device in a rack or cabinet, ensure that it has been
properly installed and grounded. For more information, see "Cabinet
installation" (page 105).
45