156 Chapter 26 FP addition
Task flow navigation
NN10600-175 6.1S2
The following references are listed alphabetically:
•
"Activating configuration changes". See NN10600-550 Nortel Networks
Multiservice Switch 7400/15000/20000 Common Configuration
Procedures.
•
"Adding an LP and linking it to an LPT". See NN10600-550 Nortel
Networks Multiservice Switch 7400/15000/20000 Common
Configuration Procedures.
•
"Adding an LPT". See NN10600-550 Nortel Networks Multiservice
Switch 7400/15000/20000 Common Configuration Procedures.
•
"Card testing". See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.
•
"Changing fasteners on an MSA32 sparing panel" (page 213)
•
"Configuring a new processor card". See NN10600-550 Nortel Networks
Multiservice Switch 7400/15000/20000 Common Configuration
Procedures.
•
"FP decommissioning" (page 159)
•
"Installing a blank processor card" (page 243)
•
"Installing a termination panel": choose the appropriate procedure:
— "Installing a 13-inch termination panel on a Multiservice
Switch 7420" (page 235)
— "Installing a 13-inch termination panel on a Multiservice
Switch 7440" (page 238)
— "Installing a 19-inch rack-mounted termination panel" (page 240)
•
"Installing an MSA32 sparing panel":
— "Installing multiple MSA32 sparing panels (DB15 or BNC)"
(page 356)
— "Installing multiple MSA32 sparing panels (RJ-45)" (page 360)
•
"Installing an FP" (page 321)
•
"Installing FP cables" (page 349)