Nortel 7400 Hardware Installation page 106

Multiservice switch
Table of Contents

Advertisement

106 Chapter 14 Cabinet installation
Figure 27
Cabinet installation task flow
For procedure page
numbers, see
Task flow navigation
below
Multiservice Switch cabinet
Preparing the floor for
a Multiservice Switch
horizontal
Unpacking a
horizontally-
packaged cabinet
Switch cabinet
Switch cabinet
NN10600-175 6.1S2
cabinet
type of shipping
package?
vertical
Unpacking a
vertically-
packaged cabinet
Removing a
Multiservice
from a pallet
Placing and
anchoring a
Multiservice
Grounding a
End
cabinet
Cabinet installation
Multiservice Switch
cabinet or Seismic
cabinet?
seismic cabinet
inside-mount
anchoring kit
Installing seismic
hardware
PP_TASK_1009
Seismic cabinet
Preparing the floor for
a seismic cabinet
Unpacking and removing
a seismic cabinet from a
pallet
Inside or
outside
mount?
inside
Anchoring a
Anchoring a
seismic cabinet
using an
outside-mount
anchoring kit
Installing seismic
brackets for a
Multiservice
Switch 7460
outside
using an

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7420744074607480

Table of Contents