106 Chapter 14 Cabinet installation
Figure 27
Cabinet installation task flow
For procedure page
numbers, see
Task flow navigation
below
Multiservice Switch cabinet
Preparing the floor for
a Multiservice Switch
horizontal
Unpacking a
horizontally-
packaged cabinet
Switch cabinet
Switch cabinet
NN10600-175 6.1S2
cabinet
type of shipping
package?
vertical
Unpacking a
vertically-
packaged cabinet
Removing a
Multiservice
from a pallet
Placing and
anchoring a
Multiservice
Grounding a
End
cabinet
Cabinet installation
Multiservice Switch
cabinet or Seismic
cabinet?
seismic cabinet
inside-mount
anchoring kit
Installing seismic
hardware
PP_TASK_1009
Seismic cabinet
Preparing the floor for
a seismic cabinet
Unpacking and removing
a seismic cabinet from a
pallet
Inside or
outside
mount?
inside
Anchoring a
Anchoring a
seismic cabinet
using an
outside-mount
anchoring kit
Installing seismic
brackets for a
Multiservice
Switch 7460
outside
using an