Nortel 7400 Hardware Installation page 37

Multiservice switch
Table of Contents

Advertisement

Figure 2
Multiservice Switch 7420 installation task flow
Multiservice
Switch 7420
installation
Installing a control
processor
For procedure page
numbers, see
Task flow navigation
below
Task flow navigation
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Unpacking a
Multiservice
Switch 7420
Installing a
Multiservice
Switch 7420 into a
Switch 7420 into a
rack or cabinet
Grounding a
dc-powered
Multiservice
Switch 7420
Installing an FP
Yes
PP_TASK_1010
The following references are listed alphabetically:
"Grounding a dc-powered Multiservice Switch 7420" (page 225)
Chapter 1 Multiservice Switch 7420 installation 37
Installing a 13"
termination panel
in a Multiservice
Switch 7420
(if necessary)
Installing a
Multiservice
seismic rack or
cabinet
Installing dc power
cables onto a
Multiservice
Switch 7420
Install
No
another FP?
Select the
mounting
option
Installing a desk-
top mounted
vertical-mount
Multiservice
Switch 7420
Installing ferrite
beads onto dc
power cables
(optional)
Powering up a
Multiservice
Switch 7420
Installing FP
cables
Installing a
Multiservice
Switch 7420
End