Section 4-4
Application Turnover Check List
Complete these checks before returning the scanner to customer for use:
4-4-1
Software Configuration Checks
Table 4-45
STEP
1.
2.
3.
4.
5.
Section 4-5
Power Supply
4-5-1
Power Supply Test Procedure
4-5-1-1
Introduction
There is no need to do any special tests on the Power Supplies if there don't seems to be a problem
that may be related to the Power Supplies.
4-5-1-2
Power Supply Adjustment
There are no adjustments on the power supplies. The DC Power is self-regulated. If a voltage is outside
the specified range, it means that something is wrong, either with the power supply itself or with a unit
connected to that specific power outlet.
Section 4-6
Site Log
Please use the Site Log found in
site visits.
4 - 82
11
Software Configuration Checks
TASK
Check Date and Time setting
Check that Location (Hospital Name &
Department) is correct
Check Language settings
Check assignment of Printer Keys
Check that all of the customer's options are
correct installed
Section 10-9 "Site Log" on page
Section 4-4 - Application Turnover Check List
CHECK (
)
10-27, or a similar Site Log, to record
V
7 S
M
IVID
ERVICE
ANUAL