Query/Retrieve Verification (cont'd)
Follow the Steps Below to Test the DICOM Query/Retrieve Workflow
NOTE:
This check uses both Ping and DICOM Ping.
- Ping is used to verify the TCP/IP connection to the server.
- DICOM Ping is used to verify that the DICOM application is answering.
1.) Select QueryRetrieve from the Selected devices list.
2.) Select Check.
-
-
11
Figure 3-83 Check the DICOM Query/Retrieve workflow
If the test pass, a pop-up dialog, reporting the results as OK, is displayed, see
Figure 3-84 Test (Check) Passed
Select OK to continue.
A green check mark to the left of the Selected devices indicates that the test was successfully
passed.
Figure 3-85 Test (Check) Passed