4-4 Application Turnover Check List

4-4-1 Software Configuration Checks

Step
1
Verify Date and Time is correct.
2
Verify that Location (Hospital Name) is correct.
3
Verify Language settings are correct.
4
Verify assignment of Print Keys.
5
Verify all of the customer's options are set up
correctly.
LOGIQ V3/V5/V5 Expert – Basic Service Manual
5726264-100 English Rev.8
Complete these checks before returning the scanner to
customer for use:
Table 4-5:
Software Configuration Checks
Task to do
Application Turnover Check List
Notes
Demo Option strings turn on
4-45

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LOGIQ V3 and is the answer not in the manual?

This manual is also suitable for:

Logiq v5Logiq v5 expertH48612aaH48612abH48612ac

Table of Contents

Save PDF