Steris Reliance EPS Endoscope Processing System Operator's Manual page 90

Table of Contents

Advertisement

WARNING
PROCESS HAZARD:
• Correct
function
system is only ensured after
any diagnosed errors have
been found, corrected and a
successful processing cycle
has been completed.
• Endoscopes and accessories
are not adequately processed,
rinsed and air purged when
processing cycle is aborted.
REPROCESS LOAD.
Processing Instructions
INEFFECTIVE
of
the
2. If it is safe to resume cycle, display shows:
3. Press STOP touch pad a second time to abort cycle.
4. If cycle cannot be resumed, display shows:
Operator Manual
alternating with:
STOP PRESSED
CYCLE DELAYED
and printer records:
==========================
CYCLE PAUSE
==========================
START TO RESUME
STOP TO CANCEL
Press START touch pad to resume cycle. Printer records:
========================
CYCLE RESUME HH:MM:SS XM
========================
... and the cycle continues with the next phase in the sequence
until the cycle is completed.
...or...
Following Abort sequence, processor performs steps below one
or two times, depending on which cycle phase was in progress:
chamber is filled with filtered hot tap water
water is recirculated
water is drained
NOTE: Procedure takes 7 to 15 minutes depending on cycle
phase in progress. Door remains locked until end of Abort
sequence(s).
STOP TO CANCEL
Press STOP touch pad to abort cycle.
During Abort sequence, display shows:
CANCELLING
HH:MM:SS XM
CYCLE
4-45
920011-649

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Reliance EPS Endoscope Processing System and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

P920011-649

Table of Contents