Process Verification And Unloading Procedure - Steris Reliance EPS Endoscope Processing System Operator's Manual

Table of Contents

Advertisement

4.9 Process
Verification and
Unloading Procedure
WARNING
PROCESS HAZARD:
• Correct function of the
system is only ensured
after any diagnosed errors
have
been
corrected and a successful
processing cycle has been
completed.
• When uncertain about any
endoscope
cycle, reprocess load.
Processing Instructions
5. Press SCROLL arrows (up or down) to choose (YES; generates
6. Press ALARM REPLY touch pad to silence audible alarm.
Reliance EPS Processor provides the operator with methods of
quality assurance monitoring and allows for immediate parametric,
process and physical verification of the cycle.
IMPORTANT: Good Hospital Practice dictates processing of all
endoscopes be verified after high level disinfection in the Reliance
EPS. Should any processing cycle fail verification, endoscope(s)
must be reprocessed in another cycle.
INEFFECTIVE
found,
processing
Operator Manual
If DUPLICATE PRINTOUT feature is enabled in Miscellaneous
Values menu of Supervisor mode (refer to S
M
V
, for setting procedure), display shows:
ISCELLANEOUS
ALUES
DUPLICATE PRINT
a duplicate of last cycle printout) or (NO; do not generate a
duplicate of last cycle printout).
NOTE: If MULTIPLE PRINTOUTS feature is enabled, the
duplicated printout(s) is (are) recorded at the end of all printouts.
Header is identified as follows:
========================
DUPLICATE PRINT
========================
Proceed with S
4.9, P
ECTION
P
.
ROCEDURE
Parametric controls are performed by the Reliance EPS
Processor to ensure each cycle meets specifications and cycle
data is documented on the printed tape (see Figures 4-24 and 4-
25).
Process verification is achieved through use of a STERIS
chemical indicator and fresh dry chemistry container detection
meter.
Physical verification of the process is performed by the operator.
The operator must ensure all process parameters were acceptable
as explained in S
ECTION
, through S
C
ONTROLS
ECTION
IMPORTANT: Processing verification must be performed within
five minutes after opening the chamber door.
IMPORTANT: Use S
ECTION
ensure all verification steps are completed as described in
4.9.1, VERIFICATION 1 – P
S
ECTION
4.9.3, VERIFICATION 3 – P
S
ECTION
ECTION
YES
# X/X
V
ROCESS
ERIFICATION AND
4.9.1, VERIFICATION 1 – P
4.9.3, VERIFICATION 3 – P
4.11, P
-P
OST
ROCESSING
C
ARAMETRIC
ONTROLS
.
HYSICAL
5.2.3, S
ETTING
U
NLOADING
ARAMETRIC
.
HYSICAL
C
HECKLIST
, to
, through
4-39
920011-649

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Reliance EPS Endoscope Processing System and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

P920011-649

Table of Contents