Debris Screen; Drip Pan - Steris Reliance EPS Endoscope Processing System Operator's Manual

Table of Contents

Advertisement

Recommended frequency of inspection is indicated in the right column. Usage and
utility conditions may require more or less frequent inspections.
ENDOSCOPE PROCESSING SUPPORT (Cont'd)
5.0
5.5
Verify three punching rods inside the Reliance CDS are tight. If loose, see S
Clean holes in valve irrigators and caps using a thin wire (such as a paper clip) or
5.6
compressed air.
Verify light cord sealing flaps on control handle boots are in good condition (not
5.7
discolored, cracked or warped). If damaged, call STERIS.*
Verify flexible silicone tubing of Flow Units is in good condition (not brittle, discolored,
5.8
cracked, yellowish). Verify Flow Unit adapters and ports are in good condition. If not,
call STERIS.*
Verify two control handle boots are in good condition (not discolored, cracked or
5.9
warped). Clean sealing surfaces of control handle boots. Verify latches are tight
and working properly. If damaged, call STERIS.*
Verify pressure transducer hoses (not brittle, discolored, cracked). If damaged,
5.10
call STERIS.*
6.0
OPTIONAL AUTOMATED LEAK TEST ASSEMBLY
Verify hose clamps for loosening or damage. Replace if necessary (refer to
6.1
Maintenance Manual [P764333-736] for details).
Using tool and grease provided in leak test hose assembly maintenance kit
6.2
(P117034-898), lubricate O-ring inside leak test hose assembly (see S
Replace leak test hose assembly O-ring with new O-ring (provided in leak test
6.3
hose assembly maintenance kit [P117034-898]; see S
7.0
FILTERS
Verify Dual Pre-Filter and Pressure Regulator Assembly cartridges. Verify filling
time on printout for last ten cycles. An increase of filling time indicates filters are
7.1
clogged. Maximum filling time allowed by processor is 3:30 to 5:00 minutes.
Replace filters if necessary (see S
Replace 0.2 μm bacterial-retentive filter (behind service access panel) every three
7.2
months or more frequently when a maintenance due message is displayed (see
S
6.10.2).
ECTION
*Contact STERIS for this service. Service charges may be incurred. Consult your warranty for details.

6.3 Debris Screen

6.4 Drip Pan

Routine Maintenance
Table 6-1. Routine Maintenance Guide (Cont'd)
6.10.1).
ECTION
After last cycle of the day, remove debris screen and clean under
running water. Replace in bottom of chamber. Always clean debris
screen while it is still wet, before debris dries.
Once a week, remove drip pan and clean under running water.
Replace drip pan in bottom of Bag-in-a-Box compartment.
Operator Manual
ECTION
6.13).
ECTION
6.14).
ECTION
Suggested
Frequency
1 X/week
6.7.
1 X/week
1 X/week
1 X/week
1 X/week
1 X/week
1 X/year
1 X/month
As required
4 X/year
4 X/year
6-3
920011-649

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Reliance EPS Endoscope Processing System and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

P920011-649

Table of Contents