WARNING
–
PROCESS
HAZARD:
placing
an
endoscope
control handle boot, ensure
endoscope suction barb is
not trapped in the flaps of
universal
cord
ensure light guide cable is
correctly placed between the
flaps of universal cord port.
4-8
920011-649
11. If using insertion tube sleeve labeled with a RED dot or a
INEFFECTIVE
When
in
port.
Also
Operator Manual
proceed as follows (see
BLUE dot,
a. Insert insertion tube sleeve into control handle boot opening,
as shown in Figure 4-5. Verify insertion tube sleeve handle is
pushed down. Insertion tube must be inserted over sleeve
handle to avoid possible damage.
IMPORTANT: Refer to Endoscope Quick Reference Guide
to ensure there are no special placement instructions
required for the endoscope being processed.
IMPORTANT: Verify angulation knobs are unlocked and
distal tip is straight before proceeding to next step.
Insertion Tube
Sleeve With a RED
Dot Identification
Latch
Figure 4-5. Insertion Tube Sleeves For Small
Diameter Insertion Tubes
Figure
4-5):
OR
Insertion Tube
Sleeve With a BLUE
Dot Identification
Push Down
Sleeve Handle
Flaps
Processing Instructions
Need help?
Do you have a question about the Reliance EPS Endoscope Processing System and is the answer not in the manual?
Questions and answers