Sign In
Upload
Manuals
Brands
Steris Manuals
Laboratory Equipment
Reliance EPS Endoscope Processing System
Steris Reliance EPS Endoscope Processing System Manuals
Manuals and User Guides for Steris Reliance EPS Endoscope Processing System. We have
1
Steris Reliance EPS Endoscope Processing System manual available for free PDF download: Operator's Manual
Steris Reliance EPS Endoscope Processing System Operator's Manual (168 pages)
Brand:
Steris
| Category:
Laboratory Equipment
| Size: 5 MB
Table of Contents
A Word from Steris
3
Advisory
3
Waste Products Disposal
4
Overview
5
Indications for Use
6
Service Information
7
Certification
7
Table of Contents
9
Safety Precautions
18
Table 1-1. Definition of Symbols
23
Table 1-2. Definition of Symbols
24
Installation Verification
26
Technical Specifications
26
Permissible Environmental Conditions
26
Noise Level
26
Voltage, Amperage and Power Consumption
26
Seismic Anchorage System (Accessory)
27
Installation Verification
27
Chemical Additive Descriptions
29
Washing Detergent
29
Dry Chemistry
29
Component Identification
30
Processor - General
30
Chamber Door
30
Service Access Panel
30
Base
30
Bag-In-A-Box Compartment
30
Figure 3-1. Processor with Countertop (Option)
31
Figure 3-2. Processor Without Countertop (Option)
31
Chamber
32
ΜM Bacterial-Retentive Filter
32
Cleaner Injection Pumps
32
Fresh Container Detection Meter
32
Figure 3-3. Chamber and Service Access Interior
33
Endoscope Processing Support
34
Control Handle Boots
34
COMPONENT IDENTIFICATION (Cont'D)
34
Large Mesh Basket and Accessory Basket
34
Valve Irrigators
34
Reliance CDS Chemical Delivery System
34
Figure 3-4. Endoscope Processing Support
35
Control
36
Operator Mode
36
Figure 3-5. Control Panel
37
Supervisor Mode
38
Service Mode
38
Display Screen
39
Audible Signal
39
Printer
39
Reliance Dry Chemistry
39
Figure 3-6. Printer
39
STERIS Chemical Indicator
40
Bar Code Reader (Accessory)
40
Figure 3-7. Bar Code Reader (Accessory)
40
Dual Pre-Filter and Pressure Regulator Assembly (Required Accessory)
41
Figure 3-8. Dual Pre-Filter and Pressure Regulator Assembly (Required Accessory)
41
Endoscope Overview and Vocabulary
42
Endoscope Vocabulary List
42
Endoscope with Biopsy/Suction System
43
Figure 3-9. Example of an Endoscope with a Simple Biopsy/Suction System
43
Endoscope with Air/Water System
44
Figure 3-10. Example of an Endoscope with a Biopsy/Suction and Air/Water System
44
Processing Instructions
46
Principles of Operation - Overview
46
Reliance EPS Endoscope Processing System
46
Optional Automated Leak Test Assembly
47
Figure 4-1. Solution Flow Schematic
47
Figure 4-2. Large Mesh Basket and Accessory Basket
50
Figure 4-3. Accessory Basket Insertion from Control Side
51
Figure 4-4. Carefully Insert Insertion Tube in Template Slot
52
Figure 4-5. Insertion Tube Sleeves for Small Diameter Insertion Tubes
53
Figure 4-6. Insert Insertion Tube into Control Handle Boot Opening
54
Figure 4-7. Place Control Handle in Control Handle Boot
54
Figure 4-8. Split Insertion Tube Sleeve
54
Figure 4-9. Feeding Distal Tip into Sleeve
55
Figure 4-10. Closing Sleeve Around Insertion Tube
55
Figure 4-11. Coil Light Guide Cable and Connect Flow Units
56
Figure 4-12. Plug to Process Only One Endoscope
57
Figure 4-13. Use Control Handle Boot Plug to Process Endoscope Without a Light Guide Cable
57
General Processing Guidelines
58
Loading Endoscope Processing Support
58
Figure 4-14. Insertion Tube Sleeve
59
Figure 4-15. Test Cord
59
Preparation
60
Figure 4-16. Automated Leak Test Hose Assembly (Fujifilm Shown)
61
Figure 4-17. Connect Quick Connect Extremity of Leak Test Hose(S) to Flexible Connection(S)
62
Figure 4-18. Connect Other Extremity of Leak Test Hose(S) to Endoscope(S)
62
Pentax Leak Test Adapter for I10C Series
63
Starting Cycle
63
Figure 4-19. Pentax Venting Connector Adapter (OE-C29)
63
Status
64
Figure 4-20. Leak Test Hoses Connections Flowchart
66
Audible Signal
67
Self-Diagnostic
68
Figure 4-21. Automated Leak Test Hose Assembly Plug (Olympus Shown)
68
Installing Reliance Dry Chemistry Container
70
Figure 4-22. Reliance Dry Chemistry
70
Inserting STERIS Chemical Indicator Strip
71
Figure 4-23. Insertion of Chemical Indicator Strip
71
Pre-Processing Checklist
72
Processing Cycle
73
Optional Testing Prior to Starting Cycle
74
Starting Cycle
75
Endoscope Detection
78
Low Chemical Warning
79
Monitoring Cycle
80
Figure 4-24. Typical Cycle Printout
81
Figure 4-25. Typical Cycle Printout - Details
82
Completing Cycle
83
Process Verification and Unloading Procedure
84
VERIFICATION 1 - Parametric Controls
85
Water Sampling Test
87
Post-Processing Checklist
89
Pause or Abort Cycle
89
Responding to a Fault
92
Faults
92
Maintenance Due Faults
94
Shutdown
95
Power Failure
95
General
95
Unlocking Processor Door During a Power Failure
97
Dry Chemistry Container Disposal
98
Figure 4-26. Door Manual Safety Latch
98
Disposing of Expired Dry Chemistry
99
Figure 4-27. Insertion Tube Sleeve
99
Figure 4-28. Test Cord
100
Cycle and Control Value Programming
102
General
102
Table 5-1. Reliance EPS Endoscope Processing System - Cycle Description Chart
103
Supervisor Mode
104
Accessing Supervisor Mode
104
Changing Cycle Values
105
Setting Miscellaneous Values
109
Performing Bar Code Test and Programming Operator and Physician ID Lists
117
Routine Maintenance
118
General
118
Routine Maintenance
119
Table 6-1. Routine Maintenance Guide
119
Debris Screen
120
Drip Pan
120
D-SHORT Cycle
121
Figure 6-1. D-SHORT Sample Printout
123
Surfaces of Processor
124
Draining Holes and Punching Rods
124
Figure 6-2. Reliance CDS Draining Holes and Punching Rods
124
Replacing Bag-In-A-Box Container
125
Figure 6-3. Bag-In-A-Box Compartment
127
Figure 6-4. Changing Bag-In-A-Box Container
128
Changing Printer Ribbon and Paper Roll
129
Figure 6-5. Printer
129
Changing Pre-Filters
130
Dual Pre-Filter and Pressure Regulator Assembly Cartridges (Required Accessory)
130
Figure 6-6. Changing Dual Pre-Filter and Pressure Regulator Assembly Cartridges
131
ΜM Bacterial-Retentive Filter Cartridge
132
D-LONG Cycle
134
Rotary Spray Arm Assembly
136
Figure 6-8. Rotary Spray Arm Assembly
136
Lubrication of Leak Test Hose Assembly O-Ring
137
Replacement of Leak Test Hose Assembly O-Ring
137
Figure 6-9. Endoscope Connection O-Ring
137
Troubleshooting
138
Troubleshooting Chart
139
Fault Chart
142
Maintenance Due Alarm Chart
162
Recommended Spare Parts and Consumable Products
164
Table 8-1. Replacement Parts
165
Advertisement
Advertisement
Related Products
Steris Reliance 6000 Series
Steris RAS 12 Rack
Steris RAS 12 Long Rack
Steris CaseCapture REC-HD01
Steris RLM26HDT
Steris RLM26HDTNPWR
Steris RLM26HD3MCNPWR
Steris RLM26HD3C
Steris Vividimage RLM274K
Steris Vividimage RLM274KNPWR
Steris Categories
Medical Equipment
Laboratory Equipment
Washer
Monitor
Lighting Equipment
More Steris Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL