4.8.1 Optional Testing Prior
to Starting Cycle
–
WARNING
PROCESS HAZARD: Before
operating processor, always
firmly
push
processing
support
manifold connectors at the
back of chamber. If support is
not positioned correctly, door
will not close, damage may
result and processor will be
unable to effectively process
load.
Processing Instructions
NOTE: The following steps may be performed if the Reliance EPS
Processor is equipped with an optional Automated Leak Test
Assembly.
IMPORTANT: The following steps are optional and only used as a
method of testing the endoscope(s) status prior to the initiation of a
standard endoscope processing cycle.
IMPORTANT: These steps are not part of a standard endoscope
processing cycle. They should only be performed if the operator
wishes to initiate an optional testing of the endoscope(s) status
before performing an endoscope processing cycle.
INEFFECTIVE
To perform a standard endoscope processing cycle, proceed
with S
endoscope
into
To perform an optional testing using the optional Automated
Leak Test Assembly, proceed as follows:
1. Ensure optional Automated Leak Test Assembly is present and
2. Ensure leak test hose(s) are connected to endoscope leak test
3. Ensure quick connect extremity of leak test hose(s) is (are)
4. Ensure pre-processing checklist was completed (see S
5. Roll endoscope processing support into chamber. Push firmly so
6. Close processor door. Push processor door firmly to engage
7. Ensure door is closed tightly. Verify display shows current date
Operator Manual
4.8.2, S
ECTION
TARTING
enabled.
port(s) (see S
4.4.1, P
ECTION
connected
to
flexible
P
).
REPARATION
P
-P
C
RE
ROCESSING
HECKLIST
IMPORTANT: Ensure no accessories stick out of endoscope
processing support.
it connects into manifold connectors at back of chamber.
locking mechanism.
and time:
MM-DD-YY
then:
NOTE: If display shows D-SHORT REQUIRED XX HOURS
LEFT or D-SHORT REQUIRED XX MINUTES LEFT, refer to
S
6.5, D-SHORT C
ECTION
REQUIRED NOW, refer to S
C
.
YCLE
).
REPARATION
connection(s)
(see
).
READY
HH:MM XM
LEAK TEST
DETECTED
YCLE
. If display shows D-LONG
6.11, D-LONG C
ECTION
S
4.4.1,
ECTION
4.7,
ECTION
YCLE
.
4-29
920011-649
Need help?
Do you have a question about the Reliance EPS Endoscope Processing System and is the answer not in the manual?
Questions and answers