Starting A Job; Engage Steering; Updating Rs1 - Raven RS1 Calibration And Operation Manual

Table of Contents

Advertisement

C
9
HAPTER

STARTING A JOB

Refer to the ROS (Raven Operating System) Basic Operation Manual (P/N 016-0171-539) for instructions on starting
a job and setting guidance lines.

ENGAGE STEERING

FIGURE 1. RS1 Status Widget on ROS
NOTE:
If the steering widget does not appear on the screen, refer to the Viper/Viper 4+ Installation and
Operation manual (P/N 016-0171-539) for further information on adding widgets.
NOTE:
The operator liability waiver must be accepted before the RS1 system can be enabled for operation.
The RS1 steering may also be engaged using the following methods:
• Tap the foot switch or rocker switch to engage RS1 features during field operation.
• Press the RS1 on-screen status widget to engage the RS1 during field operation.

UPDATING RS1

Refer to the Field Updates section on page 101 or the field computer manual for instructions on updating the RS1
software.
52
Raven RS1™ and RS Lite™ Calibration and Operation Manual
RS1 Status
Widget

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs lite

Table of Contents