Operation
Chapter 5:
Operation
Starting Jobs
The ISO UT must be calibrated specifically for the machine and implement before being used
to operate the steering system (RS1™, SC1™, or TC1™). Refer to the UT display or Raven field
computer operation manual for assistance with setting up and starting a job, setting
guidance lines, and other guidance settings during in-field operations.
Make sure to properly configure the guidance width of the UT and/or Raven field computer
for any changes to the physical width of the implement before starting a job. Review the
Raven field computer operation at
https://ravenindustries.mcoutput.com/fieldcomp/Default.htm.
Operator Liability
The Operator Liability Warning is displayed each time the RS1™ or SC1™/TC1™ system is
powered on. If the operator does not accept liability, the steering system will be disabled and
cannot be reengaged until the liability warning is accepted.
To proceed with normal operation of the GNSS and auto-steering features, read and accept
the Operator Liability Warning.