9.
Connect the Slim SAS cable to port 2 of the secondary riser.
For secondary riser port information, see Secondary riser board components.
10. Install the system board module access panel.
11. Install the system board module into the chassis.
12. Connect all peripheral cables to the server.
13. Power up the server.
The installation is complete.
More information
Remove the system board module from the chassis
Remove the system board module access panel
Remove the midplane interposer
Install the system board module into the chassis
Install the system board module access panel

HPE Smart Storage Battery

The HPE Smart Storage Battery supports the following devices:
HPE Smart Array SR controllers
After the battery is installed, it might take up to two hours to charge. Controller features requiring backup power are not
re-enabled until the battery is capable of supporting the backup power.
This server supports the 12W HPE Smart Storage Battery with the 230mm cable.

Installing an HPE Smart Storage Battery

NOTE: System ROM and firmware messages might display "energy pack" in place of "Smart Storage Battery." Energy pack
refers to both HPE Smart Storage batteries and HPE Smart Storage Hybrid capacitors.
Prerequisites
Before you perform this procedure, make sure that you have the following items available: