RECEIPT OF MATERIAL ON SITE

3 RECEIPT OF MATERIAL ON SITE
Check that the delivered parts conforms to the packing list and corresponds to approved drawing. To
identify parts, see spare parts list for nomenclature. If there are missing parts, immediately contact Arit-
co Lift AB.
Check that delivered material is not damaged from the transport. If there are damages, immediately
contact the transport company and Aritco Lift AB. Store the material in its packing material until
installation.

3.1 TOOL-AND FIXING REQUIREMENTS

Before starting the assembly, make certain that all requisite tools and documents are at hand. Such as:
• Hoist (500 kg)
• Lifting device and lifting slings
• Torque wrenches
• Drilling machine / screw - Driving machine with moment clutch
• Drill set (1 – 13 mm)
• Pop rivet drill (3.2 mm)
• Compass saw
• Compass saw blade for metal
• Hammer drill
• Concrete drill (8 – 12 mm)
• Crow bar
• Hammer
• Plumb with line (15 m)
• Spirit level
• Measure tape
• Pop rivet tool
• Plate shearing tool (Right & Left)
• Mandrel (8 mm)
• Screw driver (2.5 – 5.5 mm)
• Screw driver cross (PH 1 + 2)
• Screw driver, Torx T30
• Magnetic screw bit holder
• Magnetic screw bit holder(300 mm)
• Bit PH2
• Magnetic case (10 mm)
• File
• Clamp
• Complete set of sockets and spanners (10 – 19 mm)
• Insulation tester
• Frame and door carriage
• Ladder
• Fixings material for guide rail, frame and doors. For instance expander bolts, chemical bolts etc.