5.7.5 SHAFT VIEW B

Fig. 65 Shaft view B
• Assemble a pair of shaft profiles, one on view A and one on view C, starting on the pit floor.
• Check and adjust (if necessary) that the distance is 38-40 mm between the safety frame and the out-
side of the shaft profiles.
Note:
Make sure that the joints of the shaft profiles on sides A-B and B-C do not coin-
cide, to provide better stability for the shaft. Recommended dislocation of the
shaft profiles joints is about 400 mm.
• Lock the profiles with installation screws 4.2x14.
• Cut a shaft profile to start the shaft wall on the pit floor on view B.
Note:
Remove the plastic cover from the filled wall panels before assembling them.
• The first filled wall panel is to be checked with a water level. Adjust it horizontally and lock it with in-
stallation screws 4.2x14 in the shaft profiles.
• Continue to build shaft profiles and filled wall panels. Build 3 panels at a time, check and adjust so
that the distance between the safety frame on the platform and the inside of the shaft walls are 10-
12 mm.
• Also check that the doors are closing tightly to the frames.
• Cut the last filled wall panels so that it ends 10 mm before reaching the top height.
• Finish with a cut shaft profile at the top.
• Fixate the shaft brackets on the architrave on the left and right side.

5.8 DOOR CONNECTIONS

5.8.1 DOOR LOCKING WIRE CONNECTION

WARNING
Switch off main switch when working with any electrical components.
7000 100 en-GB AD
ASSEMBLY
71