Temporarily fasten one side cladding panel.
9
Tighten the second fixing pos 2/ ILLUSTRATION
165 in the floor landing.
10
Pull out the wire into the mast.

6.9.3 INSTALLATION OF HALF SIZE DOOR ON VIEW B

• Locate the highest point of the floor, in the door's opening range in view B.
• Place the architrave with a door lid for the electrical cabinet so that the upper edge is 1100 mm from
the highest point of the floor view B.
• Fixate the architrave with a door lid for the electrical cabinet with screw drilling 4,2 mm into the in-
ner beam.
• Continue the installation of shaft and doors on side A and C. See chapter 5.7 SHAFT CONSTRUCTION.
If cable channel assembly is used, seeFig. 157 Cable channel assembly, this must be considered when
building the shaft on view A and C.
• Mount the shaft profile (part no. 10 039) on view A and C up to the lower part of the threshold on
the upper level.
• The distances between door threshold and safety frame are to be 10-12 mm.
• Mount shaft panels and doors on side B up to a level, 125 mm below the top landing.
• Fixate two angle brackets into the floor landing, 47 mm down from the floor.
Fig. 151 Fix the door temporarily
Fig. 152 Side cladding panel fastening –half size door