14 Platform Installation (No Jib Boom) - Skyjack SJ82 T Service Manual

Telescopic booms
Hide thumbs Also See for SJ82 T:
Table of Contents

Advertisement

Section 5 – Procedures
4. Connect the hoses for the platform rotary
actuator.
5. Install the hoses and P-clamps to the side of the
jib boom.
IMPORTANT
Make sure all wiring cables are routed and secured
to avoid pinching or chafing as the platform
moves.
6. Connect the platform control console. Refer to
the Platform Controls Wiring diagrams in Section
3.
CAUTION
Risk of personal injury or equipment damage.
Test equipment operation before putting machine
into service. See Function Tests in the Operating
Manual.
229040ABA
192

5.4-14 Platform Installation (no Jib Boom)

For torque specifications, refer to
Specifications.
1. Connect lifting slings to the platform assembly.
2. Using suitable lifting equipment, move the
platform into place.
3. Install the main pivot bolt pin, flat washer and
hex nut. Tighten to the correct torque.
4. Install the bolts that secure the rotary actuator
to the platform base mount. Apply Loctite 242 to
the bolt threads. Tighten to the correct torque.
M62252AA
5. Connect the hydraulic hoses to the platform
rotator.
6. Install the P-clamp for the hoses and wire cables
to the side of the fly boom nose.
IMPORTANT
Make sure all wiring cables are routed and secured
to avoid pinching or chafing as the platform
moves.
Connect the platform control console. Refer to the
Platform Controls Wiring diagrams in Section 3.
CAUTION
Risk of personal injury or equipment damage.
Test equipment operation before putting machine
into service. See Function Tests in the Operating
Manual.
Boom
2.2 MEWP Torque
M62066AA
SJ82 T, SJ86 T

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86 t

Table of Contents