Section 5 – Procedures
6. Pull the disconnected harness out of the strain
relief connector in the box.
7. Pull all harnesses through the cable guard on
the swivel joint.
229040ABA
184
8. Mark and disconnect the hydraulic hoses for
the jib cylinder and the platform rotary actuator.
Use a suitable container or rags to catch any
oil spillage. Cap hoses and ports to keep them
clean.
9. Remove the hoses and wire cable bundle from
the P-clamps on the side of the jib boom.
M62021AA
M62018AA
10. Using suitably rating lifting equipment and safe
rigging practices, connect lifting slings to the jib
boom and platform. Tension the slings enough
to lightly take the weight off the mounting
bracket pins.
Boom
SJ82 T, SJ86 T