Section 5 – Procedures
2. Remove the auxiliary AC receptacle box if its
harness is bundled with the other harnesses.
Remove the harness clamps.
3. Open the control console lid and disconnect the
jib and platform rotate harness.
4. Remove tie wraps and make note of wire labels
for reinstallation.
5. To release each wire, insert a small flat
screwdriver into the slot beside it in the terminal
strip.
229040ABA
186
6. Pull the disconnected harness out of the strain
relief connector in the box.
7. Pull all harnesses through the cable guard on
the swivel joint.
M62191AA
8. Remove the hoses and wire cables from the
P-clamp on the side of the fly boom.
9. Using suitably rated lifting equipment and safe
rigging practices, attach slings to the platform
assembly. Tension the slings to lightly support
the platform.
10. Remove the 8 bolts that secure the rotary
actuator valve to the platform base mount.
11. Remove the main pivot bolt.
M62321AA
12. Carefully move the platform assembly away from
the end of the machine. Set it down on suitable
blocking nearby. Place it close enough to the
end of the main boom so the control cables can
be reconnected in the event boom repositioning
is required.