Scheduled Maintenance Inspections; Electrical; Hydraulic; Labels - Skyjack SJ82 T Service Manual

Telescopic booms
Hide thumbs Also See for SJ82 T:
Table of Contents

Advertisement

Section 1 – Scheduled Maintenance
1.6 Scheduled Maintenance
Inspections
Do an inspection of the MEWP in this sequence.
WARNING
Do not operate a MEWP until all malfunctions have
been corrected. If you do not obey, there is a risk
of death or serious injury.
WARNING
Turn the main power disconnect switch to the
off position before you do the visual and daily
maintenance inspections. If you do not obey, there
is a risk of death or serious injury.

1.6-1 Electrical

Do a check on these areas for chafed, corroded, and
loose wires:
Boom to platform cable harness
Engine compartment electrical panel
Engine wiring harness
Rotary manifold wiring
229040ABA
18
1

1.6-2 Hydraulic

Do a check on these areas and make sure there are
no signs of leakage:
Hydraulic tank filter, fittings, hoses, emergency-
power unit, turret and base surfaces
Engine compartment fittings, hoses, primary
pump, filter, turret and base surface
All hydraulic cylinders
All hydraulic manifolds
The ground area below the MEWP .

1.6-3 Labels

Refer to the labels section in the Operating Manual.
Make sure all the labels are in the correct location, are
in good condition, and you can read them.

1.6-4 Limit switches

Do an inspection of all limit switches
the turret and on the boom. Inspect for the following:
Broken or missing actuator arms
Missing fasteners
Loose wiring.

Scheduled Maintenance Inspections

(B)
(B)
located inside
1
SJ82 T, SJ86 T

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86 t

Table of Contents