Battery Replacement; Turret Rotation Gear Bolt Torque Sequence - Skyjack SJ82 T Service Manual

Telescopic booms
Hide thumbs Also See for SJ82 T:
Table of Contents

Advertisement

Section 5 – Procedures

5.5-5 Battery Replacement

1. Turn the main power disconnect switch
off position.
2. Remove the positive and negative connectors
from the batteries.
3. Remove the battery retainer bracket nuts and
washers
.
2
4. Remove the bracket
5. Remove the batteries
6. Replace the battery pad
7. Replace the batteries and secure them with the
bracket, j-hooks, washers and nuts.
8. Clean the terminal posts and clamps of the
batteries, and apply acid-free and acid-resistant
grease.
9. Re-connect the batteries with the positive and
negative connector cables (ensure the clamps
make good contact).
229040ABA
214
to the
1
.
3
.
4
if needed.
5
5.5-6 Turret Rotation Gear Bolt Torque
Sequence
WARNING
Maintaining proper torque is essential to safe
aerial platform operation. Improper bolt torque
could result in an unsafe operating condition and
component damage.
1. Set the torque wrench to 140 ft-lb (190 Nm)
and tighten the mounting bolts in a criss-cross
pattern sequence.
20
16
1
12
24
23
8
22
12
4
11
10
18
18
17
16
14
6
10
6
2. Set the torque wrench to 280 ft-Ib (380 Nm)
and tighten the mounting bolts with the same
sequence.
1
5
9
2
3
13
13
14
15
7
8
9
19
20
21
11
4
5
15
19
2
SJ82 T, SJ86 T
Turret
17
3
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86 t

Table of Contents