Lauda IN 130 T Operation Manual page 73

Integral process thermostats and high-temperature thermostats
Table of Contents

Advertisement

Fig. 36: Application with vent valve
Fill an empty device
Fig. 37: Pump menu in Integral XT
V6
Information on filling the device
Refilling during operation is possible.
n
Only operate the thermostat if a flow in the consumer system is pos-
n
sible. Open any shut-off valves in the consumer.
During filling, the device may overflow if the consumer is positioned
n
higher than the device and filling is interrupted (e.g. due to a power
failure). There may be even larger amounts of air in the consumer, which
allows the filled liquid to flow back. In case of doubt, a shut-off valve
should be attached to the lower connection of the application.
A vent valve Fig. 36 can significantly simplify the aeration process. For
n
this purpose, periodically open the valve carefully and allow gas/air to
escape until liquid escapes from the valve, and then close the vent valve
again. Collect the liquid in a suitable container. Operate the valve again
at regular intervals until no more air escapes.
Notes on fill mode in Integral XT
The fill mode (only in Integral XT) supports you in filling the device.
n
Messages in the display guide you through the filling process. Follow the
instructions and switch on the display with the [>>] softkey.
Furthermore, the fill mode removes gas bubbles and air bubbles from
n
the thermostatic circuit. The pump starts automatically at pump level 2
(IN 2560 XTW/PW: pump level 4) and switches off briefly every
45 seconds for better aeration. Heating and cooling unit are switched
off. Observe the pressure indication and level indication until the level no
longer drops, the pressure indication no longer rises and the degassing
symbol is no longer displayed for at least two minutes. Venting takes
at least a few minutes and can take more than an hour in unfavorable
conditions with large-volume consumers and high viscosity.
For high-temperature thermostats, the switchover between the indi-
n
vidual hydraulic paths takes place alternately every 20 seconds. This
produces a buzzing sound of about 5 seconds. The displayed pressure
changes periodically.
Protective equipment:
1.
Close the drain tap or taps. To do this, turn the tap clockwise.
2.
Attach a suitable hose (heat transfer liquid/temperature) to the over-
flow connection on the device.
3.
Place the end of this hose into a suitable canister to collect the
overflowing heat transfer liquid.
4.
Switch on the device.
You can also switch the Integral T into standby.
5.
Remove the tank lid. Use a funnel for filling, if required.
6.
Carefully fill the heat transfer liquid. Check the level indicator and do
not overfill the device!
Recommendation: Fill the device up to level 6.
Integral Process Thermostats and High-Temperature Thermostats
Safety glasses
n
Protective gloves
n
Protective work clothing
n
Only for Integral XT: If the tank is empty (level 0), the fill mode is
started immediately after switching on the device.
73 / 198

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents