Lauda IN 130 T Operation Manual page 18

Integral process thermostats and high-temperature thermostats
Table of Contents

Advertisement

Fig. 3: Ring bolt (example)
18 / 198
Fig. 2: Unpacking instructions
7.
Fig. 2: Remove the ring bolts from the packaging.
8.
Fig. 4: Screw the two ring bolts all the way into the thread connection
Ç (M10 or M16) on the top of the casing. Turn them clockwise to do
so.
Integral Process Thermostats and High-Temperature Thermostats
V6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents