Overview Of Iec Pelv/Nec ® Class 2 Wiring - Lutron Electronics GRAFIK Eye QSGRN-6PCE Installation And Operation Manual

Table of Contents

Advertisement

Wiring the GRAFIK Eye
Overview of IEC PELV/NEC
IR Wiring
1.0 mm
each
2
terminal
From external
IR connection
(by others)
Contact Closure Input Wiring
24 V
50 mA
For settings, see CCI Mode Setup.
Example:
Occupancy sensor
1.0 mm
(maximum 1)
Signal
+V Input
Circuit Common
LUT-ELI-3PH
Example:
Emergency lighting interface (maximum 1)
Note: The GRAFIK Eye
QS control unit
®
must be powered by a Normal/
Emergency distribution panel for
proper ELI operation. Refer to the
LUT-ELI-3PH Installation Guide for
the complete wiring diagram.
®
QS Control Unit:
®
Class 2 Wiring
®
1: IR DATA
2: IR COM
A: CCI SIG
B: 24 V
C: CCI COM
QS Link Control Wiring
24 V
Common and power (terminals 1 and 2):
Two 1.0 mm
each terminal
2
Two 4.0 mm
To control
stations, window
treatments, or
A: CCI SIG
other GRAFIK Eye
B: 24 V
QS control units
C: CCI COM
Data (terminals 3 and 4):
Twisted, shielded pair 0.5 mm
each terminal
100 mA
each terminal (for link <153 m)
2
each terminal (for link 153-610 m)
2
1 2 3 4 5 6 L N
®
2
1 2 3 4 5 6 L N
GRAFIK Eye
QS Control Unit Installation and Operation Guide 7
®
1 2 3 4 5 6 L N
1 2 3 4 5 6 L N
1: COM
2: 24 V
*
* Do not connect terminal 2
3: MUX
between any GRAFIK Eye
4: MUX
QS control unit and any other
power supply, including another
GRAFIK Eye
See "Power Group Wiring" for a
detailed wiring example.
Note: Use appropriate wire
connecting devices as
specified by local codes.
®
N H 1 2 3
QS control unit.
®

Advertisement

Table of Contents
loading

Table of Contents