Setting Up - Ametek mocon Dansensor CheckMate3 User Manual

Table of Contents

Advertisement

12
User Guide

Setting up

1. Place the device on a level and stable surface.
2. Connect the supplied needle set
right side of the device as shown below, then place the needle in the holder
3. Connect the power supply
connection
4. Starting up and use of the device is described in
P/N 300042-I
05/2019
NOTE! It is not possible to fit the needle set without a filter on the measuring gas
inlet. Make sure that all connections are pressed firmly and carefully together,
as leaks will compromise the measurement results.
between the main power supply outlet and the 24 VDC
at the back of the device (labelled
EN
to the measuring gas inlet
).
4
"Operation and Maintenance" on page
®
Dansensor
CheckMate 3
(labelled
) on the
.
5
15.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents