RF-Conductor! Controller NIU Remote Configuration
Setting Link Path Delay
This command is used to compensate for the propagation time through the base transmitter
and link propagation delay over the satellite while using Direct Sync alignment type. Once the
new offset is set, a perform maintenance command to ensure that the offset value entered
provides the appropriate results.
1.
From the Alignment menu, use the
Setting Link Path Delay
Figure 3-10: Alignment Menu—Setting Link Path Delay
2.
The Select Sign screen appears. Position the cursor to select Positive or Negative and
press:
<Return>.
3.
The Select Delay screen appears. Position the cursor to select Absolute or Relative and
press:
<Return>.
4.
The Set Link Path Delay screen appears (see Figure 3-11).
May 1998
to position the cursor to the left of the listing
<tab>
and press:
(see Figure 3-10).
<Return>
6880494G55-O
Alignment Commands
3-11